Davao Sticker Custom
Use the work plan to order the walkaround
Bring the coverage drawing and start where the crew handles equipment. Check the cab entry, load area, and other parts named in the quote. Ask the installer to show the ends of each piece near steps, trim, or a bed accessory. If the pickup is due for another fitting, mark any location that could be affected by that work.
Check the work surfaces in their usual position
Open the doors and tailgate with the installer when safe. Look where the film sits beside your normal loading and access points. Compare the finished areas with the marked scope and ask about anything that differs. Take a wide and close photo of any boundary you want the crew to recognize.
Give the crew one care and reporting note
Record the film product, installation date, covered panels, and care guidance. Name the person who shares it with the wash provider. Ask staff to photograph any change and include the date and panel name. Keep the installer’s contact with the same record.
Decide who owns the first follow-up
Put the first wash date and any scheduled check on the crew calendar. Ask the person taking the vehicle to confirm where the installer’s instructions live and which areas to photograph if they see a change. Give the same contact and job reference to the person coordinating later accessory work. Ask that person to share any changes with the crew.
Review the photos with the person taking the first shift
Point out what is covered before the pickup goes into service. Save the signed scope and the notes for any later check.
For planning the rear work surfaces, see the work vehicle rear bumper coverage guide.